The National Office of Railways has announced temporary changes to the passenger train services along the Marrakech-Sidi Ibrahim route, coinciding with the ongoing construction of the high-speed rail line connecting Kenitra and Marrakech. This modification is part of a broader effort to integrate the new line with the existing infrastructure, a crucial technical step aimed at enhancing the capabilities of the Marrakech station. The upgrades will increase both the number of tracks and platforms, allowing the station to accommodate high-speed trains alongside traditional ones in the future.
According to the office, these exceptional measures will take effect starting Tuesday, April 21, at 9 PM, and will remain in place until Thursday, April 23, 2026, at 11 PM. During this period, the departures and arrivals of the
As reported by anbaetv.ma.